Engineering, Procurement, Construction and Commissioning (EPCC) of KLUANG City Gate Station Upgrading project (KLUANG). The scope of work involves engineering, design, procurement, construction, installation and commissioning of anew complete gas metering skid with 2 x 100% configuration, 600# rating with 10” Inlet Header, 10” Meter Stream, and 12” Outlet Header; with carbon steel material. Each runs consist of 10” QSonic Gas Ultrasonic Flow Meter, 2 units of Tartarini Regulator (Master & Slave) and GPO DIB Type 1 and Outlet Isolation Valve and other instrument required to complete the skid. The system consists of Supervisory Computer with Citect Human Machine Interface, Metering Control Panel complete with; Multistream FloBoss S600+ Flow Computers dedicated for each run (redundant configuration), one (1) unit M340 PLC, one (1) unit DC UPS, printer and all associated accessories to complete the panel.
TRANSWATER offers competitive compensation and benefits package, challenging work opportunities and incentive for job advancement. We are keen to hear from dynamic and motivated individuals who are interested in pursuing a rewarding career with us.