Scope of work involves engineering, design, procurement, modification, removal, installation and commissioning of one liquid metering. The new metering skid shall consist of 4 x 33.3% ; 4”, 600#, SS liquid metering with 8” inlet and outlet header. Each run will consist of 4” helical blade turbine meter, DBB main isolation valves, strainer, and all required instruments to complete the run. Due to the complexity and very footprint and accessibility, the project will be loose supply, without skid base and structure and shall be “Lego” installed at site. Scope of work is complete with supply new metering control panel and system.